• -55%
  • New

IEEE PC37.242

$103.00
$46.35 Save 55%

IEEE PC37.242 IEEE Draft Guide for Synchronization, Calibration, Testing, and Installation of Phasor Measurement Units (PMUs) for Power System Protection and Control

standard by IEEE,

Quantity
In stock

Full Description

Scope

The document provides guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power system protection and control. The following are addressed in this guide:a) Considerations for the installation of PMU devices based on application requirements and typical bus configurations.b) Techniques focusing on the overall accuracy and availability of the time synchronization system.c) Test and calibration procedures for PMUs for laboratory and field applications.d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).

Purpose

This guide is intended to be used by power system protection professionals for PMU installation and covers the requirements for synchronization of field devices and connection to other devices including PDCs.

Abstract

Revision Standard - Active - Draft.Guidance for synchronization, calibration, testing, and installation of phasor measurement units (PMUs) applied in power systems is provided. The following are addressed in this guide: (a) Considerations for the installation of PMU devices based on application requirements and typical substation electrical bus configurations; (b) Techniques focusing on the overall accuracy and availability of the time synchronization system; (c) Test and calibration procedures for PMUs for laboratory and field applications; (d) Communications testing for connecting PMUs to other devices including Phasor Data Concentrators (PDCs).

M00001025
2021-02-20
New product